Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups
(2011)
Journal Article
Menezes, A. A., Clark, A., & Almada-Lobo, B. (2011). Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups. Journal of Scheduling, 14(2), 209-219. https://doi.org/10.1007/s10951-010-0197-6
In production planning, sequence dependent setup times and costs are often incurred for switchovers from one product to another. When setup times and costs do not respect the triangular inequality, a situation may occur where the optimal solution inc... Read More about Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups.