Skip to main content

Research Repository

Advanced Search

All Outputs (1)

Production lot sizing and scheduling with non-triangular sequence-dependent setup times (2014)
Journal Article
Clark, A., Mahdieh, M., & Rangel, S. (2014). Production lot sizing and scheduling with non-triangular sequence-dependent setup times. International Journal of Production Research, 52(8), 2490-2503. https://doi.org/10.1080/00207543.2014.885662

This paper considers a production lot sizing and scheduling problem with sequence-dependent setup times that are not triangular. Consider, for example, a product that contaminates some other product unless either a decontamination occurs as part of a... Read More about Production lot sizing and scheduling with non-triangular sequence-dependent setup times.