Skip to main content

Research Repository

Advanced Search

Outputs (17)

Environment and health (1998)
Journal Article
Scally, G., & Perkins, C. (1998). Environment and health. Hospital Medicine -London-, 59(11), 872-876

Upper domination and upper irredundance perfect graphs (1998)
Journal Article
Gutin, G., & Zverovich, V. (1998). Upper domination and upper irredundance perfect graphs. Discrete Mathematics, 190(1-3), 95-105. https://doi.org/10.1016/S0012-365X%2898%2900036-3

Let β(G), Γ(G) and IR(G) be the independence number, the upper domination number and the upper irredundance number, respectively. A graph G is called Γ-perfect if β(H) = Γ(H), for every induced subgraph H of G. A graph G is called IR-perfect if Γ(H)... Read More about Upper domination and upper irredundance perfect graphs.

Line hypergraphs: A survey (1998)
Journal Article
Tyshkevich, R., & Zverovich, V. (1998). Line hypergraphs: A survey. Acta Applicandae Mathematicae, 52(1), 209-222. https://doi.org/10.1023/A%3A1005963110362

The survey is devoted to line graphs and a new multivalued function L called the line hypergraph. This function generalizes two classical concepts at once, namely the line graph and the dual hypergraph. In a certain sense, line graphs and dual hyperg... Read More about Line hypergraphs: A survey.

Factors impacting construction project duration: A comparison between France, Germany and the UK (1998)
Journal Article
Proverbs, D., Holt, G. D., & Olomolaiye, P. (1998). Factors impacting construction project duration: A comparison between France, Germany and the UK. Building and Environment, 34(2), 197-204. https://doi.org/10.1016/S0360-1323%2898%2900004-3

A survey of contractors planning engineers in France, Germany the U.K. indicates significant differences between projected completion times for an identical model building. Completion times are shortest in France, followed by Germany and then the U.K... Read More about Factors impacting construction project duration: A comparison between France, Germany and the UK.

A needs-based methodology for classifying construction clients and selecting contractors (1998)
Journal Article
Chinyio, E. A., Olomolaiye, P., Kometa, S. T., & Harris, F. C. (1998). A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(1), 91-98. https://doi.org/10.1080/014461998372628

Clients' needs are inadequately evaluated in project schemes. Without a precise establishment of clients' preferences, the essential criteria for project implementation and especially contractor evaluation cannot be appreciated fully. It is not surpr... Read More about A needs-based methodology for classifying construction clients and selecting contractors.

Quantification of construction clients' needs through paired comparisons (1998)
Journal Article
Chinyio, E. A., Olomolaiye, P., & Corbett, P. (1998). Quantification of construction clients' needs through paired comparisons. Journal of Management in Engineering, 14(1), 87-92. https://doi.org/10.1061/%28ASCE%290742-597X%281998%2914%3A1%2887%29

The psychometric technique of paired comparisons was employed to quantify clients' construction project needs. If clients' requirements can be adequately evaluated, projects can be planned with more certainty and be tailored to greater client satisfa... Read More about Quantification of construction clients' needs through paired comparisons.