Production setup-sequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patching
(2010)
Journal Article
Toso, E. A., Clark, A., & Morabito, R. (2010). Production setup-sequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patching. Journal of Scheduling, 13(2), 111-121. https://doi.org/10.1007/s10951-009-0135-7
This paper considers the usefulness of a production lot sizing and scheduling model at an animal nutrition plant with sequence-dependent setup times. The model covers multiple periods and is based on the asymmetric travelling salesman problem (ATSP).... Read More about Production setup-sequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patching.