Jelena M Andri?
The cost performance and causes of overruns in infrastructure development projects in Asia
Andri?, Jelena M; Mahamadu, Abdul-Majeed; Wang, Jiayuan; Zou, Patrick X. W.; Zhong, Ruoyu
Authors
Abdul Mahamadu Abdul.Mahamadu@uwe.ac.uk
Associate Lecturer - CATE - AAE - UAAE0001
Jiayuan Wang
Patrick X. W. Zou
Ruoyu Zhong
Abstract
© 2019 The Author(s). Published by VGTU Pr. Infrastructure plays a major role in the economic development of countries, especially in Asia which has experienced tremendous growth in recent years. The procurement of infrastructure continues to be characterized by cost overruns resulting in significant academic interest and theoretical propositions on the influential factors. This study contributes to this issue through adoption of pragmatic research methodology involving deterministic statistical analysis of real project data from reports as well as a qualitative analysis of these reports to unearth underlying issues from a thematic analysis. Furthermore, the study design takes a multi-country view towards establishing the role of contextual and geographical influences on cost overrun. An evaluation of 102 major infrastructure projects was performed covering railways, roadways and energy sectors in different regions in Asia. Findings reveal that differences in the propensity for cost overrun are mostly dependent on a type of infrastructure with rail projects being the most likely to overrun budget. Theoretically, propositions on the influence of project contextual factors are tested highlighting the influence of project size, project type, geographical locations, and the length of implementation period of a project as well as factors related to political, economic, strategic, and competence in infrastructure delivery which vary across countries.
Journal Article Type | Article |
---|---|
Acceptance Date | Jan 7, 2019 |
Publication Date | Mar 1, 2019 |
Deposit Date | May 9, 2019 |
Publicly Available Date | May 9, 2019 |
Journal | Journal of Civil Engineering and Management |
Print ISSN | 1392-3730 |
Electronic ISSN | 1822-3605 |
Publisher | Taylor & Francis |
Peer Reviewed | Peer Reviewed |
Volume | 25 |
Issue | 3 |
Pages | 203-214 |
DOI | https://doi.org/10.3846/jcem.2019.8646 |
Keywords | infrastructure projects, cost overruns, project type, geographical location, project size, implementation period, Asia. |
Public URL | https://uwe-repository.worktribe.com/output/851065 |
Publisher URL | https://doi.org/10.3846/jcem.2019.8646 |
Contract Date | May 9, 2019 |
Files
Andric 2019 Cost overrun 8646-ArticleText-20654-2-10-20190228 Copy.pdf
(1.6 Mb)
PDF
You might also like
Briefing: Towards exploring profession-specific BIM challenges in the UK
(2014)
Journal Article
Challenges to building information modelling implementation in UK: Designers' perspectives
(2014)
Presentation / Conference Contribution
Inquiry into the health and safety management practices of contractors in Vietnam: Preliminary findings
(2015)
Presentation / Conference Contribution
A study of health and safety management practices of contractors in Southern Vietnam
(2015)
Presentation / Conference Contribution
Downloadable Citations
About UWE Bristol Research Repository
Administrator e-mail: repository@uwe.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2025
Advanced Search