Skip to main content

Research Repository

Advanced Search

Deploying Kaizen events in the manufacturing industry: An investigation into managerial factors

Garza-Reyes, Jose Arturo; Christopoulos, Christos; Kumar, Anil; Luthra, Sunil; Gonz�lez-Aleu, Fernando; Kumar, Vikas; Villarreal, Bernardo

Deploying Kaizen events in the manufacturing industry: An investigation into managerial factors Thumbnail


Authors

Jose Arturo Garza-Reyes

Christos Christopoulos

Anil Kumar

Sunil Luthra

Fernando Gonz�lez-Aleu

Bernardo Villarreal



Abstract

Despite the extensive research on Continuous Improvement (CI), limited reflection has been reported regarding the managerial factors needed to successfully deploy Kaizen Events (KEs). This study investigates various managerial aspects that affect the implementation of KEs. After conducting a literature review and gathering experts' inputs, the objectives of the study and six research questions were formulated. A survey questionnaire responded by 175 manufacturing organisations was designed and validated. A combined approach of descriptive statistics and one-way ANOVA tests were used to analyse the collected data. Besides other 'soft' aspects, the results determine: (1) the drivers and barriers in the pre-implementation stage of KEs; (2) the critical success factors and challenges related to the implementation stage of KEs; (3) the reasons that result in unsuccessful KEs; and (4) the reasons that stop organisations from running KEs. The study provides insights into an under-researched topic by looking at different phases of KEs implementation. The study contributes to the contingency and the RBV theories by offering an understanding of the importance of different contingencies and resources planning for KEs implementation. The findings are beneficial for industrialists who may aim at driving CIs in their organisations through the implementation of KEs.

Journal Article Type Article
Acceptance Date Sep 13, 2020
Online Publication Date Sep 24, 2020
Publication Date 2022
Deposit Date Sep 14, 2020
Publicly Available Date Sep 25, 2021
Journal Production Planning and Control
Print ISSN 0953-7287
Electronic ISSN 1366-5871
Publisher Taylor & Francis
Peer Reviewed Peer Reviewed
Volume 33
Issue 5
Pages 427-449
DOI https://doi.org/10.1080/09537287.2020.1824282
Keywords Continuous improvement; Kaizen; Kaizen Events; Lean manufacturing; Lean implementation
Public URL https://uwe-repository.worktribe.com/output/6686521

Files






You might also like



Downloadable Citations