D Heesom
Dynamic construction scheduling through a virtual reality interface
Heesom, D; Mahdjoubi, Lamine
Presentation Conference Type | Conference Paper (unpublished) |
---|---|
Conference Name | 2nd International Conference on Innovation in Architecture, Engineering and Construction |
Start Date | Jun 1, 2003 |
End Date | Jun 1, 2003 |
Publication Date | Jan 1, 2003 |
Peer Reviewed | Not Peer Reviewed |
Keywords | construction, virtual reality |
Public URL | https://uwe-repository.worktribe.com/output/1071968 |
Additional Information | Title of Conference or Conference Proceedings : 2nd International Conference on Innovation in Architecture, Engineering and Construction |
You might also like
Decision support for building thermal comfort monitoring with a sustainable GenAI system
(2025)
Presentation / Conference Contribution
Driving sustainable energy transitions with a multi-source RAG-LLM system
(2024)
Journal Article
An automated machine learning approach for classifying infrastructure cost data
(2023)
Journal Article
Downloadable Citations
About UWE Bristol Research Repository
Administrator e-mail: repository@uwe.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2025
Advanced Search