Dharshana Navendren
An examination of clients and project teams developing information requirements for the Asset Information Model (AIM)
Navendren, Dharshana; Mahdjoubi, Lamine; Mason, Jim; Shelbourn, Mark
Authors
Lamine Mahdjoubi Lamine.Mahdjoubi@uwe.ac.uk
Professor in Info. & Communication & Tech.
Dr James Mason Jim.Mason@uwe.ac.uk
Associate Professor of Construction Law
Mark Shelbourn
Abstract
The client brief not being met by the final construction project could be due to a lack of clarity and collaboration causing substantial difficulties. As the final end-product on a construction project is most heavily influenced by decisions made in the earliest stages, there lies an important necessity on clients clarifying their requirements collaboratively with the project team from the start. The impact of collaborative work from the genesis of a project is stressed especially with the implementation of Building Information Modelling (BIM) on projects, particularly with the UK government mandate to adopt BIM level 2 by 2016 on all of its projects. The crux of enabling the realisation of BIM Level 2 lies in the clients and project team understanding how the Asset Information Model (AIM), 1 of the 8 Pillars of Level 2 BIM, is informed by the client requirements formed collaboratively with the team. This paper sets out the investigation of the collaborative development of information requirements for the AIM by the client and project team. This investigation is informed by the findings of a pilot study, involving 10 design firms, where qualitative semi-structured interviews were conducted to determine designers' perceptions, attitudes and experiences of BIM implementation, especially at the early stages of the design process. This paper reports the results of the pilot study outlining challenges faced by designers in key thematic areas. Team-oriented challenges highlighted collaboration and clarity of client requirements as key problematic areas.
Presentation Conference Type | Conference Paper (unpublished) |
---|---|
Conference Name | BIM 2015 Conference |
Start Date | Sep 9, 2015 |
End Date | Sep 11, 2015 |
Publication Date | Sep 9, 2015 |
Deposit Date | Sep 23, 2015 |
Publicly Available Date | Feb 10, 2016 |
Peer Reviewed | Peer Reviewed |
Pages | 169-179 |
Keywords | clients, project team, collaboration, building information modelling (BIM), BIM level 2, asset information model (AIM), information requirements |
Public URL | https://uwe-repository.worktribe.com/output/805963 |
Publisher URL | http://dx.doi.org/10.2495/BIM150151 |
Additional Information | Title of Conference or Conference Proceedings : Building Information Modelling (BIM) in Design, Construction and Operations |
Contract Date | Feb 10, 2016 |
Files
BIM15015FU1 (1).pdf
(479 Kb)
PDF
You might also like
Downloadable Citations
About UWE Bristol Research Repository
Administrator e-mail: repository@uwe.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2024
Advanced Search