Skip to main content

Research Repository

Advanced Search

The arbitration of nature: State, water, and civil engineering in Northern Ireland directly after partition

Reinsborough, Michael

The arbitration of nature: State, water, and civil engineering in Northern Ireland directly after partition Thumbnail


Authors



Abstract

Begun in the summer of 1923, the Silent Valley Reservoir was the first large scale civil engineering project after the division between the North and the South of Ireland. It was the continuation of a previous project. In the late Nineteenth Century a portion of the Kilkeel and Annalong Rivers in the Mourne Mountains had been diverted 35 miles to provide water for the growing industrial city of Belfast in the North of Ireland. A reservoir in the mountains was also planned at a later date but this was delayed by the Great War and then by Irish political instability and the high cost of construction in immediate post war period. Before being completed the project had to overcome several obstacles. Firstly, the Mourne Mountains were claimed by the South of Ireland and thus subject to the Boundary Commission of the Anglo-Irish peace treaty. The Water Commissioners had brought important British political leaders to tour the Silent Valley construction site in an attempt to demonstrate how implausible a situation (in their opinion) that the South should control the major water supply to the capital city of the North. Secondly, shortly after the Boundary Commission was shelved, the combination of fluid subsoil and the failure to locate bedrock at expected depth brought construction to a halt while an engineering, political, and legal solution was sought for the expensive and now publicly controversial project. In the performance of local actors, this article traces the contingent relationship between state (sovereignty) and technology (water reservoir) using a socio-legal and socio-material description of the crucial arbitration process enabling further time and resources for resolution of the difficulty. Ultimately an air shaft device for excavating under increased atmospheric pressure had to be designed taking in mind both technical and political difficulties. Today the 3000-million-gallon reservoir, first imagined in the late Nineteenth Century, continues to be a major water source for the city of Belfast.

Citation

Reinsborough, M. (2021). The arbitration of nature: State, water, and civil engineering in Northern Ireland directly after partition. Water History, 13, 337–373. https://doi.org/10.1007/s12685-021-00284-6

Journal Article Type Article
Acceptance Date Sep 11, 2021
Online Publication Date Oct 10, 2021
Publication Date 2021-10
Deposit Date Sep 19, 2021
Publicly Available Date Jan 6, 2022
Journal Water History
Print ISSN 1877-7236
Publisher Springer
Peer Reviewed Peer Reviewed
Volume 13
Pages 337–373
DOI https://doi.org/10.1007/s12685-021-00284-6
Keywords water history; Northern Ireland; Sovereignty; Legal Studies; Actor-Network Theory; performance; technology; devices
Public URL https://uwe-repository.worktribe.com/output/7774671

Files







You might also like



Downloadable Citations