The importance of BIM capability assessment: An evaluation of post-selection performance of organisations on construction projects
Mahamadu, Abdul-Majeed; Manu, Patrick; Mahdjoubi, Lamine; Booth, Colin; Aigbavboa, Clinton; Abanda, F.H.
Authors
Patrick Manu Patrick.Manu@uwe.ac.uk
Professor of Innovative Construction and Project Management
Lamine Mahdjoubi Lamine.Mahdjoubi@uwe.ac.uk
Professor in Info. & Communication & Tech.
Colin Booth Colin.Booth@uwe.ac.uk
Professor of Smart and Sustainable Infrastructures
Clinton Aigbavboa
F.H. Abanda
Abstract
Purpose: The emergence of building information modelling (BIM) has led to the need for pre-qualification and selection of organisations capable of working within a BIM environment. Several criteria have been proposed for the assessment of an organisation’s BIM capability during the pre-qualification and selection phase of projects. However, no studies have sought to empirically establish whether organisations selected on the basis of such criteria have actually been the most successful at delivering BIM on projects. The purpose of this paper is to address the aforementioned gap through a comparison of predicted BIM capability and post-selection performance. Design/methodology/approach: BIM capability of firms in a case study was predicted using 28 BIM pre-qualification and selection criteria, prioritised based on their perceived contribution to BIM delivery success from a survey of practitioners on BIM-enabled projects. The comparison of predicted BIM capability and post-selection performance was, on the other hand, achieved through the application of the Technique to Order Preference by Similarity to Ideal Solution and fuzzy sets theory (Fuzzy-TOPSIS). Findings: Findings underscore the reliability of the 28 BIM pre-qualification and selection criteria as well as the priority weightings proposed for their use in predicting BIM capability and likelihood of performance. The findings have highlighted the importance of criteria related as previous BIM use experience as well as information processing maturity as critical indicators of the capability of organisations, particularly design firms. Originality/value: Overall, the findings highlight the need for prioritisation of BIM pre-qualification and selection criteria on the basis of their actual contribution to delivery success from post-selection evaluation of performance.
Journal Article Type | Article |
---|---|
Acceptance Date | May 15, 2019 |
Online Publication Date | Jul 22, 2019 |
Publication Date | Jan 30, 2020 |
Deposit Date | Oct 28, 2019 |
Publicly Available Date | Oct 29, 2019 |
Journal | Engineering, Construction and Architectural Management |
Print ISSN | 0969-9988 |
Publisher | Emerald |
Peer Reviewed | Peer Reviewed |
Volume | 27 |
Issue | 1 |
Pages | 24-48 |
DOI | https://doi.org/10.1108/ecam-09-2018-0357 |
Keywords | General Business, Management and Accounting; Civil and Structural Engineering; Architecture ; Building and Construction |
Public URL | https://uwe-repository.worktribe.com/output/4168832 |
Files
The Importance of BIM Capability Assessment: An Evaluation of Post-Selection Performance of Organisations on Construction Projects
(1.3 Mb)
PDF
Licence
http://www.rioxx.net/licenses/all-rights-reserved
Publisher Licence URL
http://www.rioxx.net/licenses/all-rights-reserved
Copyright Statement
This is the author's accepted manuscript of an article appearing in Engineering, Construction and Architectural Management. The version of record can be found here: https://doi.org/10.1108/ecam-09-2018-0357
You might also like
Briefing: Towards exploring profession-specific BIM challenges in the UK
(2014)
Journal Article
Challenges to building information modelling implementation in UK: Designers' perspectives
(2014)
Presentation / Conference Contribution
Inquiry into the health and safety management practices of contractors in Vietnam: Preliminary findings
(2015)
Presentation / Conference Contribution
A study of health and safety management practices of contractors in Southern Vietnam
(2015)
Presentation / Conference Contribution
Downloadable Citations
About UWE Bristol Research Repository
Administrator e-mail: repository@uwe.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2025
Advanced Search