Chibuike C. Chidiobi
Prioritising critical attributes for the management of materials procurement and construction waste
Chidiobi, Chibuike C.; Booth, Colin A.; Lamond, Jessica E.
Authors
Colin Booth Colin.Booth@uwe.ac.uk
Professor of Smart and Sustainable Infrastructures
Jessica Lamond Jessica.Lamond@uwe.ac.uk
College Dean for Research & Enterprise
Abstract
Construction and demolition waste constitutes the largest municipal solid waste (MSW) globally with environmental concerns. However, waste management is not considered a priority objective in construction compared to time and cost. Therefore, construction practitioners' waste management priority is evaluated in this study. A review of the literature revealed waste management attributes from multiple perspectives. A questionnaire survey was adopted to solicit practitioners' contributions on their importance. Then, the attributes were prioritised and categorised into high, medium and low priorities using the Voting Analytical Hierarchy Process (VAHP). Empirical results indicate that the high priority materials procurement attributes were alliance with suppliers, a take-back clause in suppliers' agreement document, accurate material quantification, accurate material ordering, and just-in-time delivery (JIT) plan. Senior managers' early commitment to waste minimisation, effective communication among project participants, making subcontractors responsible for their waste, identifying recyclable materials and identifying reusable materials were high-priority attributes for managing waste in the construction stage. The findings of this study indicate areas where contractors should focus effort to improve waste management in the industry by collaborating with subcontractors and suppliers. Future studies should focus on developing frameworks that provide actionable means for implementing waste management attributes identified in this research.
Journal Article Type | Article |
---|---|
Acceptance Date | Dec 15, 2022 |
Online Publication Date | Feb 1, 2023 |
Publication Date | Jan 31, 2024 |
Deposit Date | Feb 5, 2023 |
Publicly Available Date | Feb 2, 2024 |
Journal | Proceedings of Institution of Civil Engineers: Waste and Resource Management |
Print ISSN | 1747-6526 |
Electronic ISSN | 1747-6534 |
Publisher | Thomas Telford |
Peer Reviewed | Peer Reviewed |
Volume | 177 |
Issue | 1 |
Pages | 29-43 |
DOI | https://doi.org/10.1680/jwarm.22.00013 |
Keywords | Waste Management; waste disposal, Civil engineering; Structural Engineering; Waste Construction management; Sustainable cities and communities |
Public URL | https://uwe-repository.worktribe.com/output/10344621 |
Publisher URL | https://www.icevirtuallibrary.com/doi/10.1680/jwarm.22.00013 |
Files
Prioritising materials procurement and construction waste management attributes
(663 Kb)
PDF
Licence
http://www.rioxx.net/licenses/all-rights-reserved
Publisher Licence URL
http://www.rioxx.net/licenses/all-rights-reserved
Copyright Statement
This is the author’s accepted manuscript. The final published version is available here: https://doi.org/10.1680/jwarm.22.00013
You might also like
A review of the causes of construction waste generation in Nigeria and recommendations
(2021)
Journal Article
The robustness of flood insurance regimes given changing risk resulting from climate change
(2014)
Journal Article
Downloadable Citations
About UWE Bristol Research Repository
Administrator e-mail: repository@uwe.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2025
Advanced Search