Skip to main content

Research Repository

Advanced Search

The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model

Chan, F. T.S.; Kumar, V.; Tiwari, M. K.

Authors

F. T.S. Chan

M. K. Tiwari



Abstract

Over the past few years growing global competition has forced the manufacturing industries to upgrade their old production strategies with the modern day approaches. As a result, recent interest has been developed towards finding an appropriate policy that could enable them to compete with others, and facilitate them to emerge as a market winner. Keeping in mind the abovementioned facts, in this paper the authors have proposed an integrated process planning and scheduling model inheriting the salient features of outsourcing, and leagile principles to compete in the existing market scenario. The paper also proposes a model based on leagile principles, where the integrated planning management has been practiced. In the present work a scheduling problem has been considered and overall minimization of makespan has been aimed. The paper shows the relevance of both the strategies in performance enhancement of the industries, in terms of their reduced makespan. The authors have also proposed a new hybrid Enhanced Swift Converging Simulated Annealing (ESCSA) algorithm, to solve the complex real-time scheduling problems. The proposed algorithm inherits the prominent features of the Genetic Algorithm (GA), Simulated Annealing (SA), and the Fuzzy Logic Controller (FLC). The ESCSA algorithm reduces the makespan significantly in less computational time and number of iterations. The efficacy of the proposed algorithm has been shown by comparing the results with GA, SA, Tabu, and hybrid Tabu-SA optimization methods.

Citation

Chan, F. T., Kumar, V., & Tiwari, M. K. (2009). The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model. International Journal of Production Research, 47(1), 119-142. https://doi.org/10.1080/00207540600818195

Journal Article Type Article
Publication Date Jan 1, 2009
Journal International Journal of Production Research
Print ISSN 0020-7543
Electronic ISSN 1366-588X
Publisher Taylor & Francis
Peer Reviewed Not Peer Reviewed
Volume 47
Issue 1
Pages 119-142
DOI https://doi.org/10.1080/00207540600818195
Keywords process planning, scheduling, outsourcing, leagile, ESCSA,
FLC
Public URL https://uwe-repository.worktribe.com/output/1001247
Publisher URL http://dx.doi.org/10.1080/00207540600818195