Skip to main content

Research Repository

Advanced Search

All Outputs (22)

Line hypergraphs (1996)
Journal Article
Zverovich, V. E., Tyshkevich, R. I., Tyshkevich, R., & Zverovich, V. (1996). Line hypergraphs. Discrete Mathematics, 161(1-3), 265-283. https://doi.org/10.1016/0012-365X%2895%2900233-M

In this paper, we introduce a new multivalued function ℒ called the line hypergraph. The function ℒ generalizes two classical concepts at once, namely, of the line graph and the dual hypergraph. In terms of this function, proofs of some known theorem... Read More about Line hypergraphs.

An investigation into the properties of micro-sphere insulating concrete (1996)
Journal Article
Harris, F. C., Olomaiye, P., Losiewicz, M., Halsey, D. P., Dews, S. J., & Olomolaiye, P. (1996). An investigation into the properties of micro-sphere insulating concrete. Construction and Building Materials, 10(8), 583-588. https://doi.org/10.1016/S0950-0618%2896%2900022-0

The aim of the investigation was to determine how the density of micro-sphere concrete influences other selected properties. A total of 672 specimens of different sizes were made from seven different concrete mixes. The ratio of cement to water mixes... Read More about An investigation into the properties of micro-sphere insulating concrete.

Project managers' perception of production problems: An Indonesian case study (1996)
Journal Article
Harris, F. C., Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Kometa, S. T. (1996). Project managers' perception of production problems: An Indonesian case study. Building Research and Information, 24(5), 302-310. https://doi.org/10.1080/09613219608727546

The findings of the survey are to be applied as validated knowledge towards a productivity problem audit system currently being developed by the authors for construction management in Indonesia.

Planned construction times and labour utilization — a comparison of UK and French contractors (1996)
Journal Article
Olomolaiye, P. O., Proverbs, D. G., Proverbs, D., Olomolaiye, P., & Harris, F. C. (1996). Planned construction times and labour utilization — a comparison of UK and French contractors. Engineering, Construction and Architectural Management, 3(3), 219-232. https://doi.org/10.1108/eb021032

The results of a model based survey of contractors' planning engineers in France and the UK suggest that planned completion times for constructing an identical high-rise in situ concrete framed structure are significantly and dramatically lower in Fr... Read More about Planned construction times and labour utilization — a comparison of UK and French contractors.

The sensitivity of bricklayers' output to changes in skill (1996)
Journal Article
Olomolaiye, P. O., Olomolaiye, P., Harris, F. C., & Price, A. F. (1996). The sensitivity of bricklayers' output to changes in skill. Computers and Structures, 58(2), 419-428. https://doi.org/10.1016/0045-7949%2895%2900136-5

This paper examines the influence of skill on bricklayers' ouput. Time utilization in 25 working day activities by 157 bricklayers on 11 sites in the U.K. were surveyed using a computerized activity sampling package. Using Stepwise regression techniq... Read More about The sensitivity of bricklayers' output to changes in skill.

A review of client-generated risks to project consultants (1996)
Journal Article
Olomolaiye, P. O., Kometa, S. T., Olomolaiye, P., & Harris, F. C. (1996). A review of client-generated risks to project consultants. International Journal of Project Management, 14(5), 273-279. https://doi.org/10.1016/0263-7863%2896%2984510-8

Client evaluation in construction consulting and contracting firms focuses almost exclusively on client financial stability to the neglect of other project-relevant attributes within the client organization. Although widely recognized as important, c... Read More about A review of client-generated risks to project consultants.

Tendering procedures, contractual arrangements and Latham: The contractors' view (1996)
Journal Article
Olomolaiye, P. O., Holt, G. D., Olomolaiye, P., & Harris, F. C. (1996). Tendering procedures, contractual arrangements and Latham: The contractors' view. Engineering, Construction and Architectural Management, 3(1-2), 97-115. https://doi.org/10.1108/eb021025

The procedural and administrative aspects of UK tendering have remained largely unaltered for decades but this may soon change in light of the recent review of the construction sector, headed by Sir Michael Latham. This paper presents findings of a n... Read More about Tendering procedures, contractual arrangements and Latham: The contractors' view.

Computer-based model for optimizing the location of a single tower crane (1996)
Journal Article
Olomolaiye, P. O., Zhang, P., Harris, F. C., & Olomolaiye, P. (1996). Computer-based model for optimizing the location of a single tower crane. Building Research and Information, 24(2), 113-123. https://doi.org/10.1080/09613219608727511

The application of a quantitative approach to determine optimum crane position is highly desirable for construction site planning. This paper describes a stochastic (random number generation to simulate real-world event sequences) simulation model to... Read More about Computer-based model for optimizing the location of a single tower crane.

Public health medicine in a new era (1996)
Journal Article
Scally, G. (1996). Public health medicine in a new era. Social Science and Medicine, 42(5), 777-780. https://doi.org/10.1016/0277-9536%2895%2900343-6

The health service reforms in the United Kingdom have posed significant problems for the carrying out of the public health function. The increasing size of populations for which health authorities are responsible makes the formation and maintenance o... Read More about Public health medicine in a new era.

Validation of the model for evaluating client-generated risk by project consultants (1996)
Journal Article
Olomolaiye, P. O., Kometa, S. T., Olomolaiye, P., & Harris, F. C. (1996). Validation of the model for evaluating client-generated risk by project consultants. Construction Management and Economics, 14(2), 131-145. https://doi.org/10.1080/014461996373575

This paper reports the results of studies in 29 construction consulting firms aimed at validating a model for evaluating client-generated risks (see Kometa et al. 1995a). Validation required quantification of project outcomes in terms of time, cost,... Read More about Validation of the model for evaluating client-generated risk by project consultants.