Skip to main content

Research Repository

Advanced Search

All Outputs (13)

Risk mitigation in PFI/PPP project finance: A framework model for financiers’ bankability criteria (2019)
Journal Article
Owolabi, H., Oyedele, L., Alaka, H., Ajayi, S., Bilal, M., & Akinade, O. (2020). Risk mitigation in PFI/PPP project finance: A framework model for financiers’ bankability criteria. Built Environment Project and Asset Management, 10(1), 28-49. https://doi.org/10.1108/BEPAM-09-2018-0120

Purpose: Earlier studies on risk evaluation in private finance initiative and public private partnerships (PFI/PPP) projects have focussed more on quantitative approaches despite increasing call for contextual understanding of the bankability of risk... Read More about Risk mitigation in PFI/PPP project finance: A framework model for financiers’ bankability criteria.

Deep learning models for health and safety risk prediction in power infrastructure projects (2019)
Journal Article
Ajayi, A., Oyedele, L., Owolabi, H., Akinade, O., Bilal, M., Davila Delgado, J. M., & Akanbi, L. (2020). Deep learning models for health and safety risk prediction in power infrastructure projects. Risk Analysis, 40(10), 2019-2039. https://doi.org/10.1111/risa.13425

Inappropriate management of Health and safety (H&S) risk in power infrastructure projects can result in occupational accidents and equipment damage. Accidents at work have detrimental effects on workers, company, and the general public. Despite the a... Read More about Deep learning models for health and safety risk prediction in power infrastructure projects.

Big data analytics system for costing power transmission projects (2019)
Journal Article
Delgado, J. M. D., Oyedele, L., Bilal, M., Ajayi, A., Akanbi, L., & Akinade, O. (2020). Big data analytics system for costing power transmission projects. Journal of Construction Engineering and Management, 146(1), https://doi.org/10.1061/%28ASCE%29CO.1943-7862.0001745

© 2019 American Society of Civil Engineers. Inaccurate cost estimates have significant impacts on the final cost of power transmission projects and erode profits. Methods for cost estimation have been investigated thoroughly, but they are not used wi... Read More about Big data analytics system for costing power transmission projects.

Critical success factors for ensuring bankable completion risk in PFI/PPP megaprojects (2019)
Journal Article
Owolabi, H. A., Oyedele, L. O., Alaka, H. A., Ajayi, S. O., Akinade, O. O., & Bilal, M. (2020). Critical success factors for ensuring bankable completion risk in PFI/PPP megaprojects. Journal of Management in Engineering, 36(1), https://doi.org/10.1061/%28ASCE%29ME.1943-5479.0000717

© 2019 American Society of Civil Engineers. This study investigates project financiers' perspectives on the bankability of completion risk in private finance initiative and public-private partnership (PFI/PPP) megaprojects. Using a mixed methodology... Read More about Critical success factors for ensuring bankable completion risk in PFI/PPP megaprojects.

Investigating profitability performance of construction projects using big data: A project analytics approach (2019)
Journal Article
Bilal, M., Oyedele, L. O., Kusimo, H. O., Owolabi, H. A., Akanbi, L. A., Ajayi, A. O., …Davila Delgado, J. M. (2019). Investigating profitability performance of construction projects using big data: A project analytics approach. Journal of Building Engineering, 26, Article 100850. https://doi.org/10.1016/j.jobe.2019.100850

© 2019 The Authors The construction industry generates different types of data from the project inception stage to project delivery. This data comes in various forms and formats which surpass the data management, integration and analysis capabilities... Read More about Investigating profitability performance of construction projects using big data: A project analytics approach.

Stimulating the attractiveness of PFI/PPPs using public sector guarantees (2019)
Journal Article
Owolabi, H., Oyedele, L., Alaka, H., Bilal, M., Ajayi, S., Akinade, O., & Agboola, A. (2019). Stimulating the attractiveness of PFI/PPPs using public sector guarantees. World Journal of Entrepreneurship, Management and Sustainable Development, 15(3), 239-258. https://doi.org/10.1108/WJEMSD-05-2018-0055

Purpose: Although the UK Guarantee Scheme for Infrastructures (UKGSI) was introduced in 2012 to address the huge financing gap for critical infrastructures, PFI sponsors have so far guaranteed only few projects. Many stakeholders in the project finan... Read More about Stimulating the attractiveness of PFI/PPPs using public sector guarantees.

Development of an IoT-based big data platform for day-ahead prediction of building heating and cooling demands (2019)
Journal Article
Luo, X. J., Oyedele, L. O., Ajayi, A. O., Monyei, C. G., Akinade, O. O., & Akanbi, L. A. (2019). Development of an IoT-based big data platform for day-ahead prediction of building heating and cooling demands. Advanced Engineering Informatics, 41, Article 100926. https://doi.org/10.1016/j.aei.2019.100926

© 2019 Elsevier Ltd The emerging technologies of the Internet of Things (IoT) and big data can be utilised to derive knowledge and support applications for energy-efficient buildings. Effective prediction of heating and cooling demands is fundamental... Read More about Development of an IoT-based big data platform for day-ahead prediction of building heating and cooling demands.

Integrating construction supply chains within a circular economy: An ANFIS-based waste analytics system (A-WAS) (2019)
Journal Article
Akinade, O. O., & Oyedele, L. O. (2019). Integrating construction supply chains within a circular economy: An ANFIS-based waste analytics system (A-WAS). Journal of Cleaner Production, 229, 863-873. https://doi.org/10.1016/j.jclepro.2019.04.232

© 2019 The circular economy agenda makes it paramount for construction supply chains to reduce material waste. Although a collaborative platform called Building Information Modelling (BIM) offers a means of supply chains integration, it has not been... Read More about Integrating construction supply chains within a circular economy: An ANFIS-based waste analytics system (A-WAS).

Benchmarks for energy access: Policy vagueness and incoherence as barriers to sustainable electrification of the global south (2019)
Journal Article
Monyei, C. G., Oyedele, L. O., Akinade, O. O., Ajayi, A. O., & Luo, X. J. (2019). Benchmarks for energy access: Policy vagueness and incoherence as barriers to sustainable electrification of the global south. Energy Research and Social Science, 54, 113-116. https://doi.org/10.1016/j.erss.2019.04.005

© 2019 The unavailability of tangible policy benchmarks continues to mitigate against sustainable electrification in the global south. Furthermore, incoherent policy benchmarks as to what should constitute clean energy allow for varying interpretatio... Read More about Benchmarks for energy access: Policy vagueness and incoherence as barriers to sustainable electrification of the global south.

Disassembly and deconstruction analytics system (D-DAS) for construction in a circular economy (2019)
Journal Article
Akanbi, L. A., Oyedele, L. O., Omoteso, K., Bilal, M., Akinade, O. O., Ajayi, A. O., …Owolabi, H. A. (2019). Disassembly and deconstruction analytics system (D-DAS) for construction in a circular economy. Journal of Cleaner Production, 223, 386-396. https://doi.org/10.1016/j.jclepro.2019.03.172

© 2019 Despite the relevance of building information modelling for simulating building performance at various life cycle stages, Its use for assessing the end-of-life impacts is not a common practice. Even though the global sustainability and circula... Read More about Disassembly and deconstruction analytics system (D-DAS) for construction in a circular economy.

Design optimisation using convex programming: Towards waste-efficient building designs (2019)
Journal Article
Bilal, M., Oyedele, L. O., Akinade, O. O., Delgado, J. M. D., Akanbi, L. A., Ajayi, A. O., & Younis, M. S. (2019). Design optimisation using convex programming: Towards waste-efficient building designs. Journal of Building Engineering, 23, 231-240. https://doi.org/10.1016/j.jobe.2019.01.022

© 2019 The Authors A non-modular building layout is amongst the leading sources of offcut waste, resulting from a substantial amount of onsite cutting and fitting of bricks, blocks, plasterboard, and tiles. The field of design for dimensional coordin... Read More about Design optimisation using convex programming: Towards waste-efficient building designs.

Offsite construction: Developing a BIM-Based optimizer for assembly (2019)
Journal Article
Gbadamosi, A. Q., Mahamadu, A. M., Oyedele, L. O., Akinade, O. O., Manu, P., Mahdjoubi, L., & Aigbavboa, C. (2019). Offsite construction: Developing a BIM-Based optimizer for assembly. Journal of Cleaner Production, 215, 1180-1190. https://doi.org/10.1016/j.jclepro.2019.01.113

© 2019 Elsevier Ltd The lack of adequate consideration of the underlying factors affecting the methods of building assembly often results in inefficiencies in the uses of building materials, equipment and manpower. These inefficiencies are further co... Read More about Offsite construction: Developing a BIM-Based optimizer for assembly.

Optimisation of resource management in construction projects: A big data approach (2019)
Journal Article
Kusimo, H., Oyedele, L., Akinade, O., Oyedele, A., Abioye, S., Agboola, A., & Mohammed-Yakub, N. (2019). Optimisation of resource management in construction projects: A big data approach. World Journal of Science, Technology and Sustainable Development, 16(2), 82-93. https://doi.org/10.1108/WJSTSD-05-2018-0044

Purpose – The purpose of this paper is to identify challenges faced in resource management in the UK construction industry and to propose some solutions to these problems. Design/methodology/approach – Based on a qualitative research methodology, 14... Read More about Optimisation of resource management in construction projects: A big data approach.