Skip to main content

Research Repository

See what's under the surface

Browse


Golden key local evaluation - Phase 3: System change (2019)
Report
Isaac, B., Bolden, R., Gasper, R., & Beardmore, A. (2019). Golden key local evaluation - Phase 3: System change

This report presents findings from Phase 3 of UWE’s Local Evaluation of Golden Key (GK), focused on understanding how GK’s system change activity has developed. The evidence is based on interviews conducted in summer 2018, with a sample of people cl... Read More about Golden key local evaluation - Phase 3: System change.

Building connections: Golden key local evaluation phase 2 report (2017)
Report
Isaac, B., Bolden, R., Pawson, C., Gulati, A., Gasper, R., Plumridge, A., …Stern, E. (2017). Building connections: Golden key local evaluation phase 2 report

This report summarises findings from Phase 2 of the UWE Local Evaluation of Golden Key (GK) in Bristol (March 2016 to Feb 2017). GK is one of 12 Big Lottery funded Fulfilling Lives partnerships across the UK, where local organisations are working to... Read More about Building connections: Golden key local evaluation phase 2 report.

Reaching out: Golden Key local evaluation phase 1 full report (2016)
Report
Gulati, A., Bolden, R., Gasper, R., Green, E., Isaac, B., Kimberlee, R., …Strauss, P. (2016). Reaching out: Golden Key local evaluation phase 1 full report

This report presents a preliminary analysis of the evidence collated for Phase 1 of the local evaluation of Bristol Golden Key. Evidence has been collected between November 2014 and March 2016 through a variety of means, including interviews with aro... Read More about Reaching out: Golden Key local evaluation phase 1 full report.

Reaching out: Golden Key local evaluation phase 1 summary report (2016)
Report
Gulati, A., Bolden, R., Gasper, R., Green, E., Isaac, B., Kimberlee, R., …Strauss, P. (2016). Reaching out: Golden Key local evaluation phase 1 summary report

This report summarises the findings from Phase 1 of the local evaluation of Golden Key though the first 18 months of initial development, progress towards delivery and operational services delivery from Autumn 2014 to Spring 2016. Bristol Golden... Read More about Reaching out: Golden Key local evaluation phase 1 summary report.