Skip to main content

Research Repository

Advanced Search

All Outputs (1)

Rolling horizon heuristics for production planning and set-up scheduling with backlogs and error-prone demand forecasts (2005)
Journal Article
Clark, A. (2005). Rolling horizon heuristics for production planning and set-up scheduling with backlogs and error-prone demand forecasts. Production Planning and Control, 16(1), 81-97. https://doi.org/10.1080/09537280412331286565

Three families of models and fast heuristic methods are developed for identifying a production plan and immediate set-up schedule for a manufacturing line with changeover times. The initial model is exact, but is optimally solvable only for very shor... Read More about Rolling horizon heuristics for production planning and set-up scheduling with backlogs and error-prone demand forecasts.