Skip to main content

Research Repository

Advanced Search

Application of an alternative contractor selection model: This paper reports on initial results from the application to real-life of a selection of exercises of an alternative selection model designed to rationalize and simultaneously broaden the scope of this often onerous task

Holt, Gary D.; Olomolaiye, Paul O.; Holt, Gery D.; Olomolaiye, Paul; Harris, Frank C.

Authors

Gary D. Holt

Paul O. Olomolaiye

Gery D. Holt

Paul Olomolaiye Paul.Olomolaiye@uwe.ac.uk
Pro Vice-Chancellor Equalities and Civic Engagement

Frank C. Harris



Abstract

The results described confirm the thorough assessment implemented by the model and an output mechanism able to highlight key contractor characteristics. The exercise also supports the contention, that examination of contractors should aim to establish project performance potential and rely less on estimated project cost (tender sum). © 1995, Taylor & Francis Group, LLC. All rights reserved.

Citation

Olomolaiye, P. O., Holt, G. D., Holt, G. D., Olomolaiye, P., & Harris, F. C. (1995). Application of an alternative contractor selection model: This paper reports on initial results from the application to real-life of a selection of exercises of an alternative selection model designed to rationalize and simultaneously broaden the scope of this often onerous task. Building Research and Information, 23(5), 255-264. https://doi.org/10.1080/09613219508727473

Journal Article Type Article
Publication Date Oct 1, 1995
Journal Building Research & Information
Print ISSN 0961-3218
Electronic ISSN 1466-4321
Publisher Taylor & Francis (Routledge)
Peer Reviewed Peer Reviewed
Volume 23
Issue 5
Pages 255-264
DOI https://doi.org/10.1080/09613219508727473
Keywords contractor selection, contractor selection, tender evaluation, client perceived project performance, model output analysis
Public URL https://uwe-repository.worktribe.com/output/1106530
Publisher URL http://www.routledge.com/