Skip to main content

Research Repository

Advanced Search

Outputs (34)

Lot sizing and scheduling for perishable food products: A review (2019)
Book Chapter
Chen, S., Berretta, R., Clark, A., & Moscato, P. (in press). Lot sizing and scheduling for perishable food products: A review. In Reference Module in Food Science (1-8). Elsevier. https://doi.org/10.1016/B978-0-08-100596-5.21444-3

Perishability is an important phenomenon that has a widespread impact on food industries. Although perishability has received much recent attention in the literature, research incorporating perishability into mathematical models for the simultaneous... Read More about Lot sizing and scheduling for perishable food products: A review.

Integrating shelf life constraints in capacitated lot sizing and scheduling for perishable products (2018)
Presentation / Conference
Chen, S., Berretta, R., Mendes, A., & Clark, A. (2018, December). Integrating shelf life constraints in capacitated lot sizing and scheduling for perishable products. Paper presented at 26th ASOR National Conference for the Australian Society of Operations Research, Melbourne, Australia

In this study, we consider a multi-item capacitated lot sizing and scheduling problem for perishable food products, which have a fixed shelf life period due to depreciation issues, such as physical deterioration or perceived value loss. We incorporat... Read More about Integrating shelf life constraints in capacitated lot sizing and scheduling for perishable products.

An effective two-stage stochastic multi-trip location-transportation model with social concerns in relief supply chains (2018)
Journal Article
Moreno, A., Alem, D., Ferreira, D., & Clark, A. (2018). An effective two-stage stochastic multi-trip location-transportation model with social concerns in relief supply chains. European Journal of Operational Research, 269(3), 1050-1071. https://doi.org/10.1016/j.ejor.2018.02.022

© 2018 Elsevier B.V. The distribution of emergency aid from warehouses to relief centers to satisfy the needs of the victims in the aftermath of a disaster is a complex problem because it requires a rapid response to human suffering when resources ar... Read More about An effective two-stage stochastic multi-trip location-transportation model with social concerns in relief supply chains.

Applications of lot sizing (2018)
Presentation / Conference
Clark, A. (2018, August). Applications of lot sizing. Presented at 9th International Workshop on Lot Sizing, Itamambuca, Ubatuba SP, Brazil

Lot-sizing lies traditionally in the manufacturing sector, but it is applicable not just to related areas such as process industries and supply chains, but also to innovative areas such as humanitarian logistics. We look at some of the applications t... Read More about Applications of lot sizing.

A novel flexible model for lot sizing and scheduling with non-triangular, period overlapping and carryover setups in different machine configurations (2017)
Journal Article
Mahdieh, M., Clark, A., & Bijari, M. (2018). A novel flexible model for lot sizing and scheduling with non-triangular, period overlapping and carryover setups in different machine configurations. Flexible Services and Manufacturing Journal, 30(4), 884-923. https://doi.org/10.1007/s10696-017-9279-5

© 2017, Springer Science+Business Media New York. This paper develops and tests an efficient mixed integer programming model for capacitated lot sizing and scheduling with non-triangular and sequence-dependent setup times and costs incorporating all... Read More about A novel flexible model for lot sizing and scheduling with non-triangular, period overlapping and carryover setups in different machine configurations.

Stochastic network models for logistics planning in disaster relief (2016)
Journal Article
Alem, D., Clark, A., & Moreno, A. (2016). Stochastic network models for logistics planning in disaster relief. European Journal of Operational Research, 255(1), 187-206. https://doi.org/10.1016/j.ejor.2016.04.041

© 2016 Elsevier B.V. All rights reserved. Emergency logistics in disasters is fraught with planning and operational challenges, such as uncertainty about the exact nature and magnitude of the disaster, a lack of reliable information about the locatio... Read More about Stochastic network models for logistics planning in disaster relief.

Industrial insights into lot sizing and schedulingmodeling (2015)
Journal Article
Almada-Lobo, B., Clark, A., Guimarães, L., Figueira, G., & Amorim, P. (2015). Industrial insights into lot sizing and schedulingmodeling. Pesquisa Operacional, 35(3), 439-464. https://doi.org/10.1590/0101-7438.2015.035.03.0439

© 2015 Brazilian Operations Research Society. Lot sizing and scheduling by mixed integer programming has been a hot research topic inthe last 20 years. Researchers have been trying to develop stronger formulations, as well as to incorporatereal-world... Read More about Industrial insights into lot sizing and schedulingmodeling.

The challenge of rescheduling nursing staff: Informing the development of a mathematical model decision tool (2014)
Report
Clark, A., Moule, P., Brodie, L., & Topping, A. (2014). The challenge of rescheduling nursing staff: Informing the development of a mathematical model decision tool

Executive Summary: This report presents the findings and recommendations from a preliminary investigation into how an NHS organisation manages sudden nursing staff shortfalls. Unexpected staff absences, which can occur on a daily basis, can impact on... Read More about The challenge of rescheduling nursing staff: Informing the development of a mathematical model decision tool.

Mapping and analysis of research and KE funding sources for operational research in the UK (2014)
Report
Clark, A. (2014). Mapping and analysis of research and KE funding sources for operational research in the UK

This project came about in 2013 after a discussion with the Chair of the Education and Research Committee of the Operational Research Society (ORS) about obtaining a clearer idea of the range and characteristics of sources of funding for research in... Read More about Mapping and analysis of research and KE funding sources for operational research in the UK.

Production lot sizing and scheduling with non-triangular sequence-dependent setup times (2014)
Journal Article
Clark, A., Mahdieh, M., & Rangel, S. (2014). Production lot sizing and scheduling with non-triangular sequence-dependent setup times. International Journal of Production Research, 52(8), 2490-2503. https://doi.org/10.1080/00207543.2014.885662

This paper considers a production lot sizing and scheduling problem with sequence-dependent setup times that are not triangular. Consider, for example, a product that contaminates some other product unless either a decontamination occurs as part of a... Read More about Production lot sizing and scheduling with non-triangular sequence-dependent setup times.