Skip to main content

Research Repository

Advanced Search

Viable business or vital environment? Deconstructing the sustainability concept in future mobility entrepreneurship (2024)
Book Chapter
Parkhurst, G., Cabanelas, P., & Paddeu, D. (2024). Viable business or vital environment? Deconstructing the sustainability concept in future mobility entrepreneurship. In N. Thomopoulos, M. Attard, & Y. Shiftan (Eds.), Sustainable Automated and Connected Transport (161-185). Emerald. https://doi.org/10.1108/s2044-994120240000019009

Rapid technological change in the transport sector is leading to a growing range of potential and actual ‘business models’ deployable for the movement of goods and people. Two key uncertainties arise from this proliferation: first, concerning which o... Read More about Viable business or vital environment? Deconstructing the sustainability concept in future mobility entrepreneurship.

Experiences of the safety operator role in the MultiCAV project (2024)
Report
Flower, J., Calvert, T., & Parkhurst, G. (2024). Experiences of the safety operator role in the MultiCAV project. Bristol: Innovate UK / Centre for Connected Automated Vehicles

The MultiCAV research and development project, co-funded by Innovate UK and the Centre for Connected and Autonomous Vehicles (CCAV), was established to deliver sustainable transport services in a ‘Mobility as a Service’ environment. The centrepiece o... Read More about Experiences of the safety operator role in the MultiCAV project.

Passenger experiences onboard the Mi-Link autonomous bus services (2024)
Report
Adeel, M., Gangoiti, X., Clark, B., & Parkhurst, G. (2024). Passenger experiences onboard the Mi-Link autonomous bus services. Bristol: Innovate UK / Centre for Connected Automated Vehicles

The MultiCAV research and development project, co-funded by Innovate UK and the Centre for Connected and Autonomous Vehicles (CCAV), was established to deliver sustainable transport services in a ‘Mobility as a Service’ environment. The centrepiece o... Read More about Passenger experiences onboard the Mi-Link autonomous bus services.

MultiCAV project partner perspectives on the Mi-Link autonomous bus services (2024)
Report
Clark, B., Gangoiti, X., & Parkhurst, G. (2024). MultiCAV project partner perspectives on the Mi-Link autonomous bus services. Bristol: Innovate UK / Centre for Connected Automated Vehicles

The MultiCAV research and development project, co-funded by Innovate UK and the Centre for Connected and Autonomous Vehicles (CCAV), was established to deliver sustainable transport services in a ‘Mobility as a Service’ environment. The centrepiece o... Read More about MultiCAV project partner perspectives on the Mi-Link autonomous bus services.

Travel to Milton Park through and beyond the COVID-19 Pandemic (2024)
Report
Clark, B., Adeel, M., & Parkhurst, G. (2024). Travel to Milton Park through and beyond the COVID-19 Pandemic. Bristol: Innovate UK / Centre for Connected and Autonomous Vehicles

The MultiCAV research and development project, co-funded by Innovate UK and the Centre for Connected and Autonomous Vehicles, was established to deliver sustainable transport services in a ‘Mobility as a Service’ environment. The centrepiece of the p... Read More about Travel to Milton Park through and beyond the COVID-19 Pandemic.

A method to enable automatic extraction of cost and quantity data from hierarchical construction information documents to enable rapid digital comparison and analysis (2023)
Journal Article
Adanza Dopazo, D., Mahdjoubi, L., & Gething, B. (2023). A method to enable automatic extraction of cost and quantity data from hierarchical construction information documents to enable rapid digital comparison and analysis. Buildings, 13(9), Article 2286. https://doi.org/10.3390/buildings13092286

Context: Despite the effort put into developing standards for structuring construction costs and the strong interest in the field, most construction companies still perform the process of data gathering and processing manually. This provokes inconsis... Read More about A method to enable automatic extraction of cost and quantity data from hierarchical construction information documents to enable rapid digital comparison and analysis.